Blade Type: | Segmented Type |
---|---|
Manufacturing Process: | Brazing |
Application: | Concrete |
Still deciding? Get samples of US$ 30/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
high quality laser welded diamond cutting disc blade for cutting rebar in concrete reinforced concrete
Why choose usApplication on Angle Grinders.
2. Feature of high quality laser welded diamond cutting disc blade for cutting rebar in concrete reinforced concrete1) High precision and speed for cutting concrete
2) Widely used in various types of concrete structural, such as concrete, reinforced concrete, cured concrete, green concrete, brick concrete, concrete pipe.
3) Cutting cured concrete is not restrictedby the construction site, environmental protection, duration, and other conditions for safety reasons, to break the traditional construction method after removal of gas cutting picks or directional blasting, which does not affect the surrounding normal traffic, short construction period, safety factor advantages.
Inch | Diameter (mm) |
Teeth length (mm) |
Teeth thickness (mm) |
Teeth height (mm) |
Teeth number (nos) |
4" | 105 | 32 | 2.2 | 7/10/12 | 8 |
4.5" | 115 | 31 | 2.2 | 7/10/12 | 9 |
5" | 125 | 31 | 2.2 | 7/10/12 | 10 |
6" | 150 | 34 | 2.2 | 7/10/12 | 11 |
7" | 180 | 34 | 2.4 | 7/10/12 | 14 |
8" | 200 | 40 | 2.4 | 7/10/12 | 13 |
9" | 230 | 37 | 2.6 | 7/10/12 | 16 |
10" | 250 | 40 | 2.6 | 10/12/15 | 16 |
12" | 300 | 40 | 3.0 | 10/12/15 | 20 |
14" | 350 | 40 | 3.2 | 10/12/15 | 24 |
16" | 400 | 40 | 3.4 | 10/12/15 | 28 |
18" | 450 | 40 | 3.6 | 10/12/15 | 32 |
20" | 500 | 40 | 4.0 | 10/12/15 | 36 |
24" | 600 | 40 | 4.4 | 10/12/15 | 42 |
26" | 650 | 40 | 4.4 | 10/12/15 | 42 |
28" | 700 | 40 | 5.0 | 10/12/15 | 40 |
30" | 750 | 40 | 5.0 | 10/12/15 | 46 |
Each laser saw blade is packed in white box, then 100pcs put in an export standard carton, gross weight per carton is limited within 13kg.
Shipping date: If there is steel discs in our stock, normally shipment within 7-10days. If not, around 25-30days.
Delivery way: By air, by sea, by land, by courier, etc.