Blade Type: | Segmented |
---|---|
Manufacturing Process: | Brazing |
Application: | Concrete |
Still deciding? Get samples of US$ 20/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Wet or dry cutting for no reinforcement concrete pipe, roads, highways, driveways, sidewalks and some types of brick and pavers and so on.
Undercut protection to prevent segment loss during cutting. Maximum cutting performance and longer life via tough wear-resistant segments.
Inch | Diameter (mm) |
Teeth length (mm) |
Teeth thickness (mm) |
Teeth height (mm) |
Teeth number (nos) |
12" | 300 | 40 | 3.0 | 10 | 20 |
12" | 300 | 40 | 3.0 | 12 | 20 |
12" | 300 | 40 | 3.0 | 15 | 20 |
Inch | Diameter (mm) |
Teeth length (mm) |
Teeth thickness (mm) |
Teeth height (mm) |
Teeth number (nos) |
4" | 105 | 32 | 2.2 | 7/10/12 | 8 |
4.5" | 115 | 31 | 2.2 | 7/10/12 | 9 |
5" | 125 | 31 | 2.2 | 7/10/12 | 10 |
6" | 150 | 34 | 2.2 | 7/10/12 | 11 |
7" | 180 | 34 | 2.4 | 7/10/12 | 14 |
8" | 200 | 40 | 2.4 | 7/10/12 | 13 |
9" | 230 | 37 | 2.6 | 7/10/12 | 16 |
10" | 250 | 40 | 2.6 | 7/10/12 | 16 |
14" | 350 | 40 | 3.2 | 10/12/15 | 24 |
16" | 400 | 40 | 3.4 | 10/12/15 | 28 |
18" | 450 | 40 | 3.6 | 10/12/15 | 32 |
20" | 500 | 40 | 4.0 | 10/12/15 | 36 |
24" | 600 | 40 | 4.4 | 10/12/15 | 42 |
26" | 650 | 40 | 4.4 | 10/12/15 | 42 |
28" | 700 | 40 | 5.0 | 10/12/15 | 40 |
30" | 750 | 40 | 5.0 | 10/12/15 | 46 |
Each 12" laser saw blade is packed in white box, then 10pcs put in an export standard carton, gross weight per carton is limited within 20-25kg.
Shipping date: If there is steel discs in our stock, normally shipment within 7-10days. If not, around 25-30days.
Delivery way: By air, by sea, by land, by courier, etc.